Condo entier
913 Cutter Ct- Short Stays All Summer - Steps to Harbour Town and Marina
Galerie de photos de l’hébergement 913 Cutter Ct- Short Stays All Summer - Steps to Harbour Town and Marina





Avis
9,69,6 sur 10 –
Exceptionnel
Condo entier
Commodités populaires
- Cuisine
- Laveuse
- Sécheuse
- Wi-Fi gratuit
- Climatisation
- Espace extérieur
Ajoutez des dates pour connaître les prix
À propos de cet hébergement
913 Cutter Ct- Short Stays All Summer - Steps to Harbour Town and Marina
- 913 Cutter Court is a 1-bedroom, 1-bath villa located in the heart of Harbour Town. In addition to its premium location, this well-appointed villa offers all the comforts of home. Note the villa does not have its own washer and dryer, but there is a laundry facility on each floor at Cutter Court with a coin-operated washer and dryer.
Just steps away from Harbour Town with its famed lighthouse and marina, you will find shopping, restaurants, outdoor entertainment, and many water sports. Biking and walking trails abound throughout Sea Pines Resort.
Town of HHI STR Permit #27720
Lighthouse Lane Infrastructure Improvement Project Phase 4 to Begin Early September 2026
Phase 4 of the Lighthouse Lane Infrastructure Improvement Project is scheduled to begin early September 2026, and is estimated to continue through early spring 2027.
Planned work will be conducted Monday-Friday from 7:00 AM to 7:00 PM, excluding major holidays. Weekend and overnight work may be necessary but will be communicated in advance.
Project Work Zone Includes:
Lighthouse Lane, Mizzenmast Lane, Windjammer Court, Mizzenmast Court, Genoa Court
Storm Water Drainage will take place on Windjammer Court and Mizzenmast Lane
Milling and paving operations will take place on Mizzenmast Lane, Windjammer Court, Mizzenmast Court, Genoa Court
Project Work will Include:
Surveying and underground utility mark outs. Please do not remove any staking or utility markings.
Stormwater drainage upgrades: Excavation and replacement of the stormwater drainage system including pipes and catch basins.
Temporary steel plates will be installed to cover open excavations.
Please be aware that construction noise will occur in the project zone throughout major construction activities
Well-pointing and dewatering operations (lowering groundwater levels to provide more stable working conditions). Overnight dewatering will be required utilizing pumping systems.
Due to the nature of major infrastructure construction work, planned and unplanned water or utility outages in the work zone may occur. This includes possible water, sewer, internet, telephone and power interruptions.
Demolition and construction of sidewalks, curbs, and roadways.
Tree and lagoon work.
Traffic Management:
Heavy machinery and construction vehicles will be traveling to and from the project site.
Single-lane road closures and flagging operations will be in place daily, weather permitting. Temporary full lane closures may be required at times.
Motorists should expect traffic delays, traffic detours, and be prepared to share the road with bike riders and pedestrians.
Pedestrians and bike riders should expect delays and be prepared to stop and follow detours.
For safety, bike riders will be required to dismount and walk bikes around the active work zones.
HIGHLIGHTS
• Courtyard View
• Free Wireless Internet